Client: David Ashley Developments
Location: Alfreton, Derbyshire
A 1,400sqm purpose self-built office and warehouse development for national contractors, comprising on-site parking, consultation spaces, canteen, cellular offices and full height foyer set over three storeys.
This is a highly energy efficient building with low running costs. Modern rain screen cladding and high performance curtain walling ensure the building retains its sustainable credentials.
![](https://www.jsa.design/app/uploads/2020/11/Photoshop-render2a-scaled_1200x600_acf_cropped.jpg)
![](https://www.jsa.design/app/uploads/2020/11/IMG_8493-scaled_600x600_acf_cropped.jpg)
Exposed concrete can be seen throughout the interior space demonstrating the occupants’ specialism.
A sustainable drainage solution (SUDS) was employed across the site ensuring there was a net reduction in off-site discharge in an area at high risk of seasonal flooding. This was combined with an integrated landscape design including parking facilities for cars, motorcycles and bikes.
![](https://www.jsa.design/app/uploads/2020/11/IMG_8496-scaled_600x600_acf_cropped.jpg)